Critical Infrastructure
The AI Cloud Data Center is a mission-critical wholesale data center located in Tucson, Arizona with 133,452 SF and +/-6.562MW of critical load. Built in 1989 with the data center construction phases beginning in 2004 (phase I), 2006 (phase II), and 2008 (phase III). The property is a large purpose-built stand-alone data center in Southern Arizona on 8.45 acres. The sole tenant is a data center development, operations entity, and energy-efficient microgrid developer and operator. The tenant emphasizes sustainability by focusing on sustainable data center construction, energy efficiency, and renewable power sources.




